Building A Sauna at RavenTree

Blog Archive

  • ►  2011 (1)
    • ►  July (1)
  • ►  2009 (2)
    • ►  August (1)
    • ►  March (1)
  • ▼  2008 (38)
    • ►  September (8)
    • ▼  August (30)
      • Block wall
      • Framing the roof
      • The Ceiling
      • Thanks to everybody!
      • Erecting the gables and ridge pole
      • Logoramathon Lunch
      • LOGORAMATHON (part III)
      • LOGORAMATHON (Part II)
      • LOGORAMATHON (Part I)
      • Building the gable ends
      • Building the gables first
      • The logs arrive ! or What's a Gin Pole?
      • Making the ridge and purlins
      • Visualizing the roof pitch
      • Logging
      • The stove slab
      • The Stove
      • The Deck
      • Framing the Floor
      • The slope
      • Two trailers.
      • Flat and Level
      • Setting up shop
      • First of many rainstorms
      • Pier Depth
      • Not only used for digging the holes for the piers ...
      • The sauna will sit on concrete piers formed from c...
      • The cleared building sit
      • The building site
      • First things first

About Me

Bruce
View my complete profile

Aug 6, 2008

Pier Depth

Each pier was set 48" below the surface. Most likely over-kill here in Massachusetts; a cary over from Alaska I guess. But I feel much more secure knowing that my piers are below frost level. I have some special plans for draining water out of the steam room of the sauna and I want the building to remain level. If it moves due to frost those plans will be messed up.
Posted by Bruce at 8/06/2008