Rain happens. Just about the time Jon and I filled the last sono tube it started to rain. We had to do a very fast job of setting the 1/2 footing bolts into the still wet concrete. We did a pretty good job as it turned out....only the porch footing bolts were a bit off....well, more like 12". No Problem though. The main footer were perfect.
Anyway we had to cover up everything with tarps so things wouldn't get washed away.